AI-native energy intelligenceMarket call to e-Tag, with the backup route already built.

Two wholesale power suppliers brought the winning idea to the AI use case workshop at OATI Energy Conference 2026: an AI agent that determines whether a book-out or a physical flow is the better choice under current market conditions, then finds available transmission on the right path, buys it and builds the associated tag. It also creates an alternative tag and transmission route in case of a curtailment.
Utah Associated Municipal Power Systems (UAMPS) and Basin Electric Power Cooperative worked the idea as one team in the workshop. The OATI AI team will develop the winning idea, and each of the two organizations will receive complimentary service for one year.
A decision made every day, against the clock
Every day, schedulers and traders make the same call. Settle a transaction financially as a book-out, or schedule it as a physical flow? The answer turns on market prices and the cost of transmission at that moment. If the power flows, someone has to find available transmission on the right path, reserve it and build the tag before the deadline. When a curtailment hits, the work starts over: a new path, a new reservation, a new tag.
The steps themselves are not the hard part. Connecting them, quickly and in the right order, is.
The data behind each one already lives in OASIS and the e-Tag. OATI built OASIS and e-Tagging, the infrastructure bulk power runs on, and the winning idea puts AI on top of that workflow, from the market call to the tag.
02 · What happens next
Customers picked it. OATI builds it.
The OATI AI team will begin with working sessions with the two organizations and develop the agent with the people who make these decisions today.
01
Working sessions first
The OATI AI team sits down with UAMPS and Basin Electric to map the decision as their desks make it today.
02
Built with the people who make the call
Schedulers and traders shape the agent: the market signals it weighs, the paths it considers and the backup it holds.
03
On the systems the grid runs on
The agent works on top of OASIS, transmission purchase and e-Tagging, the workflow these teams already run on OATI.
04
Complimentary service for one year
Each of the two organizations will receive complimentary service for one year.
“The best AI use cases come from the people who make these calls every day. This team chose a workflow that runs on OASIS and e-Tagging, systems OATI built, and asked AI to carry the decision through every step. That is the work OATI AI Genie™ was built for, and we look forward to building it with them.”
Sasan MokhtariPresident & CEO, OATI
About the winners

UAMPS
Utah Associated Municipal Power Systems provides wholesale electric energy services on a non-profit basis to 50 community-owned power systems in seven states across the Intermountain West.

Basin Electric Power Cooperative
A not-for-profit generation and transmission cooperative owned by 138 member cooperative systems across nine states.
03 · Bring your own
Is your use case ready?
The best candidate is rarely the most impressive idea. It is an operational decision made often, under time pressure, with more data than one person can weigh.
Quick winHigh importance · Low effort
Capture the easy value.
IdealHigh importance · High effort
The highest potential payoff.
DeprioritizeLow importance · Low effort
Proceed with caution.
AvoidLow importance · High effort
Low AI potential.
CHECKPOINT 1
Start from a decision
What operational decision is being made, how complex is it, who makes it and how much time do they have?
CHECKPOINT 2
Be specific
“Outage management” is a use case; “operations” is not. A narrow decision makes the data, the owner and the measure of success obvious.
CHECKPOINT 3
Rank honestly
Score each idea on importance and effort. If every idea scores high, nothing has been ranked.
CHECKPOINT 4
Plan for real constraints
Pilots rise or stall on NERC CIP, operator trust and data availability. Name each one before the pilot starts.
The internal viability check
Seven questions to ask inside your organization
0 of 7 answered
Ready · of 14
Your use case is ready for the OATI AI team.
Bring the one-line version and the team that owns the decision. The AI Genie™ team will rank your use cases with you, match each to the right AI Genie™ agent, and set out the path from idea to pilot.
Almost there · of 14
Firm up these checkpoints, then bring it to the team.
Questions in the meantime? Write to genie@oati.net.
Early · of 14
Start from the decision.
Write it as one line: the decision, who makes it, the time window and the data it depends on. That line is what leadership needs first.
04 · What we are building
AI on top of the systems the grid already runs on
OATI AI Genie™ is built on 30 years of power systems operational experience. Three segments hold the products.
From the stage · EC26 Executive Summit
AI for Energy: Strategies, Case Studies, and ROI
Utility, ISO and generation leaders on how AI moves from pilot to the control room: which problems to solve first, the data work underneath, how to measure what changed, and the guardrails that earn operator trust.
SK
Salah KhuhroSenior Vice President, OATI
IN
Indu NambiarPrincipal, IT Architecture, California ISO
PL
Pascal LanouetteVice President Operational Strategy, Brookfield Renewable
SM
Sasan MokhtariPresident & CEO, OATI
01Start from the problem
02The data is the work
03Measure what changed
04Guardrails at the prompt, between agents, on the output and in the cloud
05 · In the news
AI Genie™ making waves
Recent coverage of OATI, from the control room to the trading desk.

Nasdaq
TradeTalks · March 31, 2026
Defining next-generation energy leadership: Sasan Mokhtari, President & CEO, on Nasdaq TradeTalks
Read more »

MIT Technology Review
July 14, 2025
California is set to become the first US state to manage power outages with AI
“It’s a first step for bigger automation.”
Read more »

Latitude Media
August 12, 2025
Under the hood of CAISO’s AI outage management pilot
Read more »

Bloomberg
Interview with John Engel · July 16, 2026
How virtual power plants are saving the grid during U.S. heatwaves
Read more »

Utility Dive
August 14, 2026
Utility Dive explores OATI’s plan to unlock up to 20% more transmission capacity
Read more »

POLITICO
May 19, 2026
OATI plan to unlock transmission capacity featured by POLITICO
Read more »
