PowerNow

More capacity from the transmission grid already built

The grid carries less than it physically can, because it is rated, scheduled and coordinated on conservative assumptions set long ago. PowerNow is OATI’s initiative to unlock additional capacity on the U.S. transmission system without new physical infrastructure: no new lines, no new towers.

This is not a construction problem. It is a software and coordination problem, and it is solvable now.

The problem

Why the grid carries less than it can

The systems that calculate available transfer capability for most bulk power transactions rely on conservative assumptions, static line ratings and manual coordination processes that are more than 20 years old.

Curtailments persist on lines with physical headroom. New loads wait in interconnection queues. Transmission assets already paid for deliver less than they could.

More than 5%fewer transmission curtailmentsThe published PowerNow outcome, with no new construction.
95%of North American transmission datamoves through OATI.
PowerNow

What PowerNow brings together

Regional Coordination

Neighbors update together

Neighboring transmission operators exchange constraint data weekly, daily or hourly, and fill the gaps with conservative assumptions that hold capacity back. PowerNow automates that exchange, so each neighbor updates its capacity calculations shortly after a constraint changes. The gains are largest when adjacent operators adopt it together.

Membership

Two ways to join

Workshop Member

Shape the solution

Take part in the PowerNow workshops that scope the solution and refine regional coordination and Genie DLR™ for your system, and gain the depth your organization needs to approve the next step. Locks in Group 1 terms.

Full Member

Put it into operation

Everything in the workshops, then data integration, testing, training and production operations of Genie DLR™ combined with regional coordination. Full Members benchmark and report the findings. Group 1 terms apply.

Membership is open through January 31, 2027. Group 1 is limited in size.

PowerNow InfoSessions

Two chances to get involved

Two identical one-hour sessions, online. Choose the date that suits your team.

ThursdayDecember 311:00 a.m.-12:00 p.m. Central
WednesdayDecember 911:00 a.m.-12:00 p.m. Central
Register for an InfoSession
Agenda
  1. PowerNow: what it is
  2. How to extract additional capacity from the grid
  3. Regional coordination
  4. Genie DLR™
  5. Benefits and expected outcomes
  6. The project plan, and how OATI runs it
  7. How to join, and what each membership involves
EC26

PowerNow at the OATI Energy Conference 2026

Transmission and reliability at EC26: more from the transmission system already built, and the ratings, models and commitments behind available capability.

Read the EC26 recap
Questions about PowerNow: PowerNow@oati.net