Microgrids that EPCs and developers can stand behind.
You’re delivering a microgrid, not buying one.
Often on a fixed bid and a fixed timeline, with your reputation riding on whether it performs long after the ribbon is cut.
What you need from a controls partner isn’t just software: a platform that works across projects and equipment vendors, and a team still standing beside you when the suppliers have moved on to the next job.
What matters to EPCs and developers
Where OATI fits into your scope
Phase 1
Concept and feasibility
EPC or developer owns
Site selection, ownership structure, financing and permitting
OATI supports
Microgrid and DER consulting: site walk, load profile review and concept design input
Phase 2
Design
EPC or developer owns
Civil, structural, mechanical and general electrical design of record
OATI supports
Controls and data network design: bill of materials, enclosure layout, data network documents and sequence of operations, built to hand into your design package
Phase 3
Procurement and construction
EPC or developer owns
Equipment procurement, construction management and field installation
OATI supports
Controller hardware, OATI GridMind® and the low-voltage controls package, specified to your bill of materials and not competing for the construction contract
Phase 4
Commissioning
EPC or developer owns
Overall system acceptance and owner handoff
OATI supports
Factory and site acceptance testing, network configuration, load-shed scheme validation and a site-specific user guide
Phase 5
Operations
EPC or developer owns
The O&M contract, if retained
OATI supports
A standing platform, with an optional OATI DERMS tie-in to monetize the site’s assets
What OATI GridMind® does
One controller for the site, the utility and the market
From an empty field to a running microgrid
OATI’s power systems engineers plan, design and stand up the controls, then stay on through commissioning and operation, so the microgrid you deliver keeps performing.
More on OATI’s microgrid planning and design process in Threads of Connectivity, the documentary series distributed by NatGeo. The Paskenta project was covered by Microgrid Knowledge and Energy Storage News.
Delivered with a tribal energy developer
Paskenta Band of Nomlaki Indians, with Woven Energy

OATI has been a valued partner on our Tribal energy microgrid projects. Their team strives to understand the priorities and goals of our Tribal clients to ensure energy facility operations that support energy sovereignty and broader economic development.Development Executive, Woven Energy


OATI has been a valued partner on our Tribal energy microgrid projects. Their team strives to understand the priorities and goals of our Tribal clients to ensure energy facility operations that support energy sovereignty and broader economic development.Development Executive, Woven Energy

Resources for your microgrid project

The microgrid buyer’s guide
The features to look for in a microgrid controller and the field-proven uses of OATI GridMind®.

OATI GridMind® datasheet
Operating modes, controls and integration for the microgrid controller, on one page.

Short-term load growth strategies
Digital strategies to get more from existing DERs as data center and industrial demand climbs.
Keep exploring
Scope your next microgrid with OATI engineers
The latest from OATI

OATI breaks ground on long-duration storage at UMN Morris
UMN Morris and Otter Tail Power broke ground on a long-duration battery that OATI GridMind® will control.

National Geographic features the Paskenta tribal microgrid
The microgrid the Paskenta Band of Nomlaki Indians is building with OATI GridMind®.

Native Sun partners with OATI on tribal EV charging
Native Sun will deploy OATI’s EVolution™ smart EV charging to advance clean energy and tribal energy sovereignty.