More capacity from the transmission grid already built
The grid carries less than it physically can, because it is rated, scheduled and coordinated on conservative assumptions set long ago. PowerNow is OATI’s initiative to unlock additional capacity on the U.S. transmission system without new physical infrastructure: no new lines, no new towers.
This is not a construction problem. It is a software and coordination problem, and it is solvable now.
Why the grid carries less than it can
The systems that calculate available transfer capability for most bulk power transactions rely on conservative assumptions, static line ratings and manual coordination processes that are more than 20 years old.
Curtailments persist on lines with physical headroom. New loads wait in interconnection queues. Transmission assets already paid for deliver less than they could.
What PowerNow brings together
Neighbors update together
Neighboring transmission operators exchange constraint data weekly, daily or hourly, and fill the gaps with conservative assumptions that hold capacity back. PowerNow automates that exchange, so each neighbor updates its capacity calculations shortly after a constraint changes. The gains are largest when adjacent operators adopt it together.
Ratings that follow the weather
Most lines are rated on static, worst-case weather assumptions. Genie DLR™ computes real-time and forecast ratings from weather data, conductor characteristics and geospatial information, following IEEE 738 and IEEE 1283, without a sensor on every monitored line. Where sensors are deployed, it uses them for added accuracy.
The right action for each constraint
When a transmission path is constrained, PowerNow brings in flexible resources such as demand response, storage and controllable loads, and OATI AI Genie™ identifies the highest-impact actions for each constraint in real time.
Two ways to join
Shape the solution
Take part in the PowerNow workshops that scope the solution and refine regional coordination and Genie DLR™ for your system, and gain the depth your organization needs to approve the next step. Locks in Group 1 terms.
Put it into operation
Everything in the workshops, then data integration, testing, training and production operations of Genie DLR™ combined with regional coordination. Full Members benchmark and report the findings. Group 1 terms apply.
Membership is open through January 31, 2027. Group 1 is limited in size.
Two chances to get involved
Two identical one-hour sessions, online. Choose the date that suits your team.
- PowerNow: what it is
- How to extract additional capacity from the grid
- Regional coordination
- Genie DLR™
- Benefits and expected outcomes
- The project plan, and how OATI runs it
- How to join, and what each membership involves
PowerNow in the news
Software-based initiative could unlock up to 20% more bulk capacity: OATI
How PowerNow combines regional coordination, software-based dynamic line ratings and AI-enhanced dispatch, and why a single binding constraint can limit transfers across a region.
Read the story →Canary Media · June 10, 2026This software firm has a plan to take grid-enhancing tech nationwide
OATI’s plan to add dynamic line ratings and AI analysis to the software grid operators already run, and to share the results between neighbors.
Read the story →E&E News by POLITICO · May 18, 2026AI could make power grid more efficient — if utilities can persuade regulators
Where AI fits in getting more out of transmission, with Kevin Sarkinen on bringing varied resources onto the grid in real time.
Read the story →PowerNow at the OATI Energy Conference 2026
Transmission and reliability at EC26: more from the transmission system already built, and the ratings, models and commitments behind available capability.