Cancel Forgot password
case-studies   smart-energy   Case Study: EPB
Request the Case Study

EPB Takes Control with a Virtual Power Plant

EPB is a municipally-owned utility tasked with providing electric power to more than 170,000 residents in a 600 square-mile area that includes the greater Chattanooga, Tennessee area, parts of surrounding counties and areas of North Georgia.
 
EPB received a grant from the Tennessee Valley Authority (TVA) to develop and implement a virtual power plant as a source of generation.

OATI was able to rise to the challenge with our comprehensive demand response management system — webDistribute. OATI webDistribute allows utilities to monitor, control, schedule, and manage Demand Response assets and Distributed Energy Resources.
 
OATI webDistribute is helping EPB:

 
  • Report voltage and demand measurements from bellwether meters
  • Reduce voltage levels throughout their distribution grid
  • View real-time data to provide precise measurements for maximum load reduction
  • Optimize load reduction without affecting customers

Want to learn more? Complete the form to the right to get your copy of the EPB case study today.